Mon – Fri: 8:00 – 4:30pm
(817) 295-5151

Tennis Courts

PRACTICE OR COMPITITION

Both practice courts and an exhibition court are being poured. As with most complex projects, the mix design must meet the engineer’s requirements so that the concrete can perform the task that it was designed to do. In this case, a coating is applied to the surface to meet the specifications of league rules.